Asian Surveying & Mapping
Breaking News
India to have its own space station by 2035, says ISRO chairman
Speaking at the 14th convocation ceremony of IIT-BHU, ISRO...
Isro will not make any launch vehicle, all tech to be handed to private sector
IN-SPACe chairman Pawan Goenka said Isro is moving launch...
North Korea fires ballistic missiles as US-South Korea drills near end
South Korea has condemned North Korea’s launch ⁠of more...
Orbitworks ships UAE-built Altair-1 to US ahead of October launch
Abu Dhabi-based satellite company Orbitworks has shipped Altair-1, the...
Long March 12 launches despite recent 7A failure, Long March 2C launches satellite for UAE
HELSINKI — China launched a new batch of Guowang...
India-US space ties deepen as NASA invites ISRO to join moon base program
NASA has formally invited India to participate in its...
H3 launches navigation satellite
WASHINGTON — A Japanese H3 rocket successfully launched a...
Chinese rocket carrying satellite explodes seconds after launch
Hong Kong —  A Chinese rocket set to launch a satellite...
NASA invites ISRO to join its ambitious Moon Base programme
India and the United States are set to strengthen...
India counters China’s map war: Names of 27 Arunachal Pradesh locations standardised on Survey of India maps
The official list covers 21 land locations, four mountain...

Author Archive

Friday, January 13th, 2012

Central Visayas Cadastral Survey Set for Philippines

The Department of Environment and Natural Resources in Region 7 is set to conduct a cadastral survey covering a total of 73,661 hectares at a cost estimated to reach P163.09 million. The survey will be conducted in selected...

Friday, January 13th, 2012

Australian Kick Off Land Access Negotiations On The Right Foot

The Queensland Government has manually developed the Digital Cadastral Data Base for investigating land-related information for the state. Definium Surveyors’ Peter Hickey discusses the importance of improving the accuracy of the digital boundaries for this land access...

Friday, January 13th, 2012

Azerbaijan Announces Composition of Commission Negotiating Gabala Radar with Russia

According to the order issued by President of Azerbaijan Ilham Aliyev, the composition of the national group negotiating the status and lease principles, as well as use of the Gabala radar station (Daryal analytical-information center).

Thursday, January 12th, 2012

Geospatial Value: Linking Topographic Data to Design

Topographic data is an important piece when it comes to the design process. Very places on the planet are completely flat. Housing, roadways, utilities, pipelines and many other features are oriented on the landscape with respect to...

Thursday, January 12th, 2012

Outlay Likely for Spatial Data Infrastructure

For strengthening the National Spatial Data Infrastructure (NSDI), an outlay of Rs 750 crore has been planned during the 12th Plan. Speaking at the 11th annual meet of National Spatial Data Infrastructure conference, Mr Swarna Subba Rao, Surveyor...

Thursday, January 12th, 2012

Indian Project – Topographic Database on 1:10,000 Scale

The Survey of India (SOI) has embarked upon a project for creating a national topographic database on a 1:10,000 scale for the entire country and aims to complete it during the 12th plan period, Surveyor General of...

Thursday, January 12th, 2012

Geoimage Becomes a Reseller of Intermap Products in Australia

Geoimage is pleased to announce that it will be distributing NEXTMap products in Australia, Papua New Guinea, New Zealand and the Pacific countries after signing an agreement with Intermap Technologies.

Wednesday, January 11th, 2012

3D Documentation of Niah Caves, Sarawak

A warm, humid Monday morning marked the beginning of an expedition to the Niah Caves, located in Sarawak, East Malaysia. Involving academics from several institutes of higher learning, hailing from three different continents, this study trip was...

Wednesday, January 11th, 2012

Forestland Boundary Assessment and Delineation Completed in Region IX

It’s finished!!! After a decade of intense and dedicated work, the Forestland Boundary Assessment and Delineation for the entire Region IX, Zamboanga Peninsula has been accomplished by the Department of Environment and Natural Resources (DENR) particularly by...

Wednesday, January 11th, 2012

Speed Up Infrastructure Development to Boost Growth: Ahluwalia

Deputy Chairperson of Planning Commission Montek Singh Ahluwalia has stressed the need for accelerating infrastructure development in the country to boost growth.  Speaking on the sidelines of an event here, Ahluwalia said that the large projects which are...

Page 28 of 178 1 23 24 25 26 27 28 29 30 31 32 33 178