Asian Surveying & Mapping
Breaking News
India to have its own space station by 2035, says ISRO chairman
Speaking at the 14th convocation ceremony of IIT-BHU, ISRO...
Isro will not make any launch vehicle, all tech to be handed to private sector
IN-SPACe chairman Pawan Goenka said Isro is moving launch...
North Korea fires ballistic missiles as US-South Korea drills near end
South Korea has condemned North Korea’s launch ⁠of more...
Orbitworks ships UAE-built Altair-1 to US ahead of October launch
Abu Dhabi-based satellite company Orbitworks has shipped Altair-1, the...
Long March 12 launches despite recent 7A failure, Long March 2C launches satellite for UAE
HELSINKI — China launched a new batch of Guowang...
India-US space ties deepen as NASA invites ISRO to join moon base program
NASA has formally invited India to participate in its...
H3 launches navigation satellite
WASHINGTON — A Japanese H3 rocket successfully launched a...
Chinese rocket carrying satellite explodes seconds after launch
Hong Kong —  A Chinese rocket set to launch a satellite...
NASA invites ISRO to join its ambitious Moon Base programme
India and the United States are set to strengthen...
India counters China’s map war: Names of 27 Arunachal Pradesh locations standardised on Survey of India maps
The official list covers 21 land locations, four mountain...

November 7th, 2024
NV5 Awarded $14 Million to Advance Global AI-Driven Data Center Infrastructure; Exceeds a Gigawatt of Data Center Design and Modeling in 2024

HOLLYWOOD, Fla. – NV5 Global, Inc. (the “Company” or “NV5”) (Nasdaq: NVEE), a provider of technology, certification, and consulting solutions, announced today that it has been awarded $14 million in recent contracts to support the global development of data center infrastructure. Under the scope of these awards, NV5 will support the scalability and efficiency of new construction and the retrofitting of existing data centers in response to the heightened electrical and cooling pressures of AI-driven workloads.

NV5 also announced that it has surpassed a gigawatt (GW) in data center mechanical, electrical, and plumbing (MEP) design and computational fluid dynamics (CFD) analysis globally through September of this year. MEP design and CFD analysis work in concert to deliver optimal cooling performance, thermal dynamics, and energy efficiency for sustainable data center infrastructure.

“The expansion of our data center business continues to accelerate, and we are pleased to contribute to efficient, sustainable energy use in our clients’ operations,” said Ben Heraud, Chief Executive Officer of NV5. “In 2024, NV5’s GW of AI data center design and modeling has helped our clients unlock approximately 300MW of additional computing capacity, or roughly the amount of energy required to power 100,000 homes.”

About NV5
NV5 Global, Inc. (NASDAQ: NVEE) is a provider of technology, certification, and consulting solutions for public and private sector clients supporting utility, infrastructure, and building assets and systems. The Company primarily focuses on six business verticals: Utility services, infrastructure engineering, construction quality assurance, buildings & technology, environmental health sciences, and geospatial services. NV5 operates out of more than 100 offices nationwide and abroad. For additional information, please visit the Company’s website at www.NV5.com. Also visit the Company on TwitterLinkedInFacebook, and Vimeo.

Forward-Looking Statements
This press release contains “forward-looking statements” within the meaning of the safe harbor provisions of the U.S. Private Securities Litigation Reform Act of 1995. The Company cautions that these statements are qualified by important factors that could cause actual results to differ materially from those reflected by the forward-looking statements contained in this news release. Such factors include: (a) changes in demand from the local and state government and private clients that we serve; (b) general economic conditions, nationally and globally, and their effect on the market for our services; (c) competitive pressures and trends in our industry and our ability to successfully compete with our competitors; (d) changes in laws, regulations, or policies; and (e) the “Risk Factors” set forth in the Company’s most recent SEC filings. All forward-looking statements are based on information available to the Company on the date hereof, and the Company assumes no obligation to update such statements, except as required by law.