Asian Surveying & Mapping
Breaking News
China’s Aircraft for Geological Surveys Unveiled
TIANJIN - The world's leading aircraft for aero geophysical...
Thales Alenia Space begins construction of new facilities in Spain
The SPAINSAT NG satellite payloads will be integrated in...
Japanese satellite re-enters atmosphere after experiments in ultra-low orbit
The Japan Aerospace Exploration Agency’s Tsubame satellite, named for...
Vietnam hosts Committee on Earth Observation Satellites Plenary
The 33rd Committee on Earth Observation Satellites (CEOS) Plenary...
Geospatial Conference 2019 kicks off in Karaj
The International GeoSpatial Conference 2019 with a special focus...
Septentrio and CORE receiver will use Japan’s centimeter-level service
Septentrio and CORE partner up to develop a GPS/GNSS...
Ethiopia to launch first-ever satellite in December with China’s help: president
ADDIS ABABA - The Ethiopian President Sahle-Work Zewde on...
Japan’s AxelSpace Partners With Rwanda’s Broadband Systems Corporation To Provide Satellite Imagery To African Countries
Axelpace Corporation announces the partnership with Broadband Systems Corporation...
Abu Dhabi QCC unveils Jawdah app, smart GIS project at Gitex 2019
Abu Dhabi Quality and Conformity Council (QCC) has launched...
Apple Pulls Mapping App Used by Hong Kong Protesters
Last week, Apple rejected and then approved a mapping...

September 20th, 2018
Forward to the Moon: Airbus Wins ESA Studies for Future Human Base in Lunar Orbit

Bremen, 20 September 2018 – The European Space Agency (ESA) has commissioned Airbus for two studies for possible European involvement in the future human base in lunar orbit. The Gateway, previously known as the Deep Space Gateway (DSG) or Lunar Orbital Platform-Gateway (LOP-G), is a project involving the US, Russian, Canadian, Japanese and European space agencies (NASA, Roscosmos, CSA, JAXA and ESA).

 

Over the next 15 months, Airbus will develop a concept for a habitation and research module as part of the first study (habitat, approximately 6.5 x 4.5 metres and weighing some 9 tonnes). In the second study, Airbus will design a concept for an infrastructure element for refuelling, docking and telecommunications, which will also serve as an airlock for scientific equipment (known as Esprit, around 3 x 3 metres and weighing around 4 tonnes). Both studies will be developed as part of a far-reaching European partnership.

 

Under NASA’s overall design leadership, other elements – such as a second habitat, an airlock for scientific payloads and a logistics module – will be designed by international and commercial partners. NASA has plans to launch the first module – the central power propulsion element (PPE) – into lunar orbit in the early 2020’s.

 

“The experience and know-how that ESA and Airbus have gained during flagship projects such as the Columbus space laboratory, the ATV space transporter and the European service module for Orion provide solid foundations for the studies,” said Oliver Juckenhöfel, Head of On-Orbit Services and Exploration at Airbus. “When developing the new lunar platforms, robotic and human space exploration go hand in hand. Europe has a fantastic track record in both, and these two studies will help to ensure a strong European presence in future space exploration.”

 

David Parker, Director of Human and Robotic Exploration at ESA, said: “With these studies and other preparations, ESA aims to stay at the centre of human space exploration. The Gateway will become humanity’s most remote research outpost and we hope Europe will benefit from the world of innovation, discovery and excitement that lies ahead.”

Unlike the International Space Station (ISS), the Gateway is not intended to be continually inhabited. It is envisaged that the lunar platform will act as a staging point for human missions to the Moon or Mars, and testing is planned for a series of technologies and procedures that will be needed.

Airbus will present its initial designs for the Gateway at the International Astronautical Congress (IAC) in Bremen on 3 October 2018.