Asian Surveying & Mapping
Breaking News
India to have its own space station by 2035, says ISRO chairman
Speaking at the 14th convocation ceremony of IIT-BHU, ISRO...
Isro will not make any launch vehicle, all tech to be handed to private sector
IN-SPACe chairman Pawan Goenka said Isro is moving launch...
North Korea fires ballistic missiles as US-South Korea drills near end
South Korea has condemned North Korea’s launch ⁠of more...
Orbitworks ships UAE-built Altair-1 to US ahead of October launch
Abu Dhabi-based satellite company Orbitworks has shipped Altair-1, the...
Long March 12 launches despite recent 7A failure, Long March 2C launches satellite for UAE
HELSINKI — China launched a new batch of Guowang...
India-US space ties deepen as NASA invites ISRO to join moon base program
NASA has formally invited India to participate in its...
H3 launches navigation satellite
WASHINGTON — A Japanese H3 rocket successfully launched a...
Chinese rocket carrying satellite explodes seconds after launch
Hong Kong —  A Chinese rocket set to launch a satellite...
NASA invites ISRO to join its ambitious Moon Base programme
India and the United States are set to strengthen...
India counters China’s map war: Names of 27 Arunachal Pradesh locations standardised on Survey of India maps
The official list covers 21 land locations, four mountain...

March 12th, 2012
Russian Federation – Cadastre Development Project

This is an approach that was recommended by the team based on its experience in the Europe and Central Asia (ECA). The study visits provided the government counterparts with practical experiences and exposures to the different types of agencies and helped them to make their decisions. The Bank team adapted a tried and tested successful model of land administration projects to the realities of the Russian Federation. In this case, the Bank trusted the commitment of the Federal Agency for Cadastre of Immovable Property (Cadastre Agency), or CA and the Government’s support for the land administration strategy, and agreed not to wait for further reform on the structures of the responsible agencies (i.e. integration of land administration services as a condition for the project).  Read More