Asian Surveying & Mapping
Breaking News
South Korea launches Nuri rocket carrying 15 satellites, its 1st liftoff of 2026
The milestone came on Tuesday night (Oct. 6), when...
Iran expands GPS network using Khayyam satellite data
Iran’s National Cartographic Center (NCC) is strengthening its cooperation...
India-Japan looking to deepen economic engagement, eye greater cooperation in chips, space: Suzuki
New Delhi, Oct 4: India and Japan are looking...
Genesys International bags ₹283 crore World Bank-funded contract for Ahmedabad digital twin
The project will map 625 sq km, survey 25...
China launches new remote sensing satellite group
TAIYUAN, Sept. 24 (Xinhua) -- China launched a new...
Ahmad Belhoul Al Falasi to lead UAE delegation at IAC 2026
UAE delegation will bring together government entities, research institutions...
Korea Signs Space Cooperation MOU With Mexico
A path is opening for domestic space companies to...
China’s space diplomacy lifts Pakistani astronaut toward orbit
KARACHI, Sept 28 (Reuters) - Two Pakistani pilots are...
NV5 Global stock expands geospatial reach with $303 million deal
NV5 Global stock is linked to a Quantum Spatial...
EU and Korea deepen cooperation on secure satellite connectivity
Today, the European Commission and the Republic of Korea...

April 3rd, 2026
GMV’s IOD-1 satellite, part of ESA Celeste mission, successfully launched from New Zealand

The Celeste program will begin with two demonstrator satellites, IOD-1 and IOD-2.

Celeste IOD-1, developed by GMV and Alén Space under the European Space Agency’s (ESA) Celeste In-Orbit Demonstrator (IOD) program, was successfully launched on March 28 from Rocket Lab’s Launch Complex 1 in Māhia, New Zealand. The two satellites – built respectively by GMV and Thales Alenia Space – were launched at 10:14 CET and separated from the launcher about an hour later. This marks the beginning of their early operations phase, during which mission control gets them ready for life in orbit.

Celeste is ESA’s strategic program to demonstrate the benefits of an additional low Earth orbit (LEO) navigation layer that complements Galileo and EGNOS, with the goal of improving the accuracy, resilience, and security of positioning, navigation, and timing (PNT) services in Europe. The in-orbit demonstrator (IOD) represents the program’s first phase and will validate key LEO-PNT technologies in flight ahead of potential future operational deployment.

The Celeste IOD phase is being carried out in parallel by two European consortia and will include a total of eleven satellites plus one in-orbit spare. As one of the prime contractors, GMV is responsible for the end-to-end mission for six of the demonstrator satellites, including system definition and design, the space and ground segments, the user segment, and operations.

GMV’s IOD-1 satellite, part of ESA Celeste mission, successfully launched from New Zealand | GeoConnexion