Asian Surveying & Mapping
Breaking News
EU and Korea deepen cooperation on secure satellite connectivity
Today, the European Commission and the Republic of Korea...
Ghana, Japan explore deeper cooperation in space technology
Ghana and Japan are exploring deeper cooperation in space...
China conducts four launches inside 48 hours as launch options diversify
HELSINKI — China carried out four launches in quick...
Dubai Municipality deploys smart robot for geospatial surveys
Dubai: Dubai Municipality has deployed a smart robot to...
India’s Geospatial Sector Gets Boost With Mirai-GreenValley LiDAR Partnership
Mirai Aerospace Systems and Software Solutions and US-based GreenValley...
From drones to space tech, Japan looks to startups to strengthen its defences
Tokyo is stepping up efforts to harness dual-use technologies...
South Korea’s Space Agency Seeks 47% Budget Hike for 2027; Regular Nuri Launches, Lunar Lander Development to Begin
The Korea AeroSpace Administration (KASA) has proposed a 2027...
Space42 launches Future Spacers Programme to develop UAE space talent
Space42, the UAE-based AI-powered SpaceTech company, has launched the...
US, China arm for space warfare: hunter satellites and orbital weapons
Amid the rapidly-evolving field of military space operations, Beijing...
ISRO Puts India’s First Geo Imaging Satellite In Orbit, PM Modi Hails EOS-05 Launch Aboard GSLV-F17
The Indian Space Research Organisation (Isro) successfully launched EOS-05,...

April 3rd, 2026
GMV’s IOD-1 satellite, part of ESA Celeste mission, successfully launched from New Zealand

The Celeste program will begin with two demonstrator satellites, IOD-1 and IOD-2.

Celeste IOD-1, developed by GMV and Alén Space under the European Space Agency’s (ESA) Celeste In-Orbit Demonstrator (IOD) program, was successfully launched on March 28 from Rocket Lab’s Launch Complex 1 in Māhia, New Zealand. The two satellites – built respectively by GMV and Thales Alenia Space – were launched at 10:14 CET and separated from the launcher about an hour later. This marks the beginning of their early operations phase, during which mission control gets them ready for life in orbit.

Celeste is ESA’s strategic program to demonstrate the benefits of an additional low Earth orbit (LEO) navigation layer that complements Galileo and EGNOS, with the goal of improving the accuracy, resilience, and security of positioning, navigation, and timing (PNT) services in Europe. The in-orbit demonstrator (IOD) represents the program’s first phase and will validate key LEO-PNT technologies in flight ahead of potential future operational deployment.

The Celeste IOD phase is being carried out in parallel by two European consortia and will include a total of eleven satellites plus one in-orbit spare. As one of the prime contractors, GMV is responsible for the end-to-end mission for six of the demonstrator satellites, including system definition and design, the space and ground segments, the user segment, and operations.

GMV’s IOD-1 satellite, part of ESA Celeste mission, successfully launched from New Zealand | GeoConnexion