Controllers there, in cooperation with the satellite manufacturer OHB, confirm the good health and the nominal behaviour of both satellites. A procedure to deploy the solar arrays that had remained partially folded on both satellites was successfully executed on the first satellite in the course of Monday night. A similar procedure will be executed soon on the second satellite.
Both satellites continue to be kept in a safe state, correctly pointing to the Sun, properly powered and fully under control of the ESA/CNES integrated team and the teams of OHB deployed at ESA’s control centre
In parallel, the teams are investigating the possibilities to exploit the satellites to their best despite the non-nominal injection orbit and within the limited propulsion capabilities of the satellites.